Uranium Mills and Disposal Facilities.

Board (RC)

FAQs

Laws & Rules

Programs

Public Participation

Records Request


Calendar

Forms

Low Level Waste

Radiation Issues


About DRC

Acronyms

Contact DRC

Organization Chart

Related Links

DRC Home > Uranium Mills > DUSA Groundwater Permit

Uranium Mill and Disposal Facilities:
DUSA Groundwater Permit Renewal Application

 

DATE

 

SIZE

Sept 1, 2009 White Mesa Uranium Mill Permit Renewal Application State of Utah Ground Water Permit No. UGW370004, Appendices A, B, C, D, E, F, G, H, I J, K, MAPS 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12
38575 KB
 

Permits, Licenses, Statement of Basis, Plans and Related Reports

  (i) State of Utah Ground Water Discharge Permit No. UGW 370004
3 MB
  (ii) State of Utah Radioactive Materials License No. UT 1900479
1015 KB
  (iii) 2004 Statement of Basis for a Uranium Mill Facility at White Mesa
12 MB
  (iv) Reclamation Plan White Mesa MIll Blanding, Utah
46 MB
  (v) UMETCO Minerals Corporation: White Mesa Mill Drainage Report
41 MB
 

Background Groundwater Quality reports and Related Studies

  (i) Revised Background Groundwater Quality Report: Existing wells for Denison Mines (USA) corp's White Mesa Mill Site
46 MB
  (ii) Revised Addendum: -- Evaluation of Available Pre-Operational & Regional Background data
33 MB
  (iii) Revised Addendum: -- Background Groundwater Quality Report: New wells for Denison Mines (USA) Corp's White Mesa Mill Site, San Juan County, Utah
168 MB
  (iv) Summary of work completed, data results, interpretations and recommendations for the July 2007 Sampling Event
3.4 MB
 

Environmental Reports and Analyses

  (i) Environmental Report, White Mesa Uranium Project San Juan County, Utah, January 30, 1978
4.3 MB
  (ii) Final Environmental Statement Related to Operation of White Mesa Uranium Project Energy Fuels Nuclear, Inc., 1979
14 MB
 

Engineering, Geological and Hydrogeological Reports

  (i) Groundwater Study, White Mesa Facilities, 1993
3 MB
  (ii) Hydrogeological Evaluation of White Mesa Uranium Mill, July 1994
12 MB
  (iii) Evaluation of Potential for Tailings Cell Discharge
2 MB
  (iv) Update to Report Investigation of Elevated Chloroform Concentrations in Perched Groundwater
7 MB
  (v) Hydraulic Testing at the White Mesa Uranium Mill Blanding, During July 2002
2 MB
  (vi) Letter Report dated August 29, 2009
3 MB
  (vii) Perched Monitoring Well Installation and Testing at the White Mesa Uranium Mill April - June 2005
24 MB
  (viii) Site Hydrogeology and Estimation of Groundwater Travel Times in The Perched Zone White Mesa Uranium Mill Site, August 27, 2009
10 MB
 

Plans & Specifications relating to Construction & Operation of the Mill's Tailing Cells

  (i) Engineers Report: Tailings Management System
6 MB
  (ii) Engineer's Report: Second Phase Design - Cell 3 Tailings Management Systems
6 MB
  (iii) Construction Report: Initial Phase - Tailings Management System, February 1982
6 MB
  (iv) Construction Report: Second Phase Tailings Management Systems, March 1983
19 MB
  (v) Cell 4 Design, White Mesa Project, April 10, 1989
27 MB
  (vi) Construction Report: Tailings Cell 4A, White Mesa Uranium Mill - Tailings Management System, August 2000
14 MB
  (vii) Cell 4A Lining System Design Report for the White Mesa Mill, January 2006
21 MB
  (viii) Cell 4A Construction Quality Assurance Report, July 2008
205 MB
 

Documents Relating to the Chloroform investigation at the Site

  (i) Preliminary Corrective Action Plan, August 20, 2007
24 MB
  (ii) Preliminary Contamination Investigation Report, November 20, 2007
12 MB