DATE |
|
SIZE |
| Sept 1, 2009 |
White Mesa Uranium Mill Permit Renewal Application State of Utah Ground Water Permit No. UGW370004, Appendices A, B, C, D, E, F, G, H, I J, K, MAPS 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12 |
38575 KB |
| |
Permits, Licenses, Statement of Basis, Plans and Related Reports |
|
| |
(i) State of Utah Ground Water Discharge Permit No. UGW 370004 |
3 MB |
| |
(ii) State of Utah Radioactive Materials License No. UT 1900479 |
1015 KB |
| |
(iii) 2004 Statement of Basis for a Uranium Mill Facility at White Mesa |
12 MB |
| |
(iv) Reclamation Plan White Mesa MIll Blanding, Utah |
46 MB |
| |
(v) UMETCO Minerals Corporation: White Mesa Mill Drainage Report |
41 MB |
| |
Background Groundwater Quality reports and Related Studies |
|
| |
(i) Revised Background Groundwater Quality Report: Existing wells for Denison Mines (USA) corp's White Mesa Mill Site |
46 MB |
| |
(ii) Revised Addendum: -- Evaluation of Available Pre-Operational & Regional Background data |
33 MB |
| |
(iii) Revised Addendum: -- Background Groundwater Quality Report: New wells for Denison Mines (USA) Corp's White Mesa Mill Site, San Juan County, Utah |
168 MB |
| |
(iv) Summary of work completed, data results, interpretations and recommendations for the July 2007 Sampling Event |
3.4 MB |
| |
Environmental Reports and Analyses |
|
| |
(i) Environmental Report, White Mesa Uranium Project San Juan County, Utah, January 30, 1978 |
4.3 MB |
| |
(ii) Final Environmental Statement Related to Operation of White Mesa Uranium Project Energy Fuels Nuclear, Inc., 1979 |
14 MB |
| |
Engineering, Geological and Hydrogeological Reports |
|
| |
(i) Groundwater Study, White Mesa Facilities, 1993 |
3 MB |
| |
(ii) Hydrogeological Evaluation of White Mesa Uranium Mill, July 1994 |
12 MB |
| |
(iii) Evaluation of Potential for Tailings Cell Discharge |
2 MB |
| |
(iv) Update to Report Investigation of Elevated Chloroform Concentrations in Perched Groundwater |
7 MB |
| |
(v) Hydraulic Testing at the White Mesa Uranium Mill Blanding, During July 2002 |
2 MB |
| |
(vi) Letter Report dated August 29, 2009 |
3 MB |
| |
(vii) Perched Monitoring Well Installation and Testing at the White Mesa Uranium Mill April - June 2005 |
24 MB |
| |
(viii) Site Hydrogeology and Estimation of Groundwater Travel Times in The Perched Zone White Mesa Uranium Mill Site, August 27, 2009 |
10 MB |
| |
Plans & Specifications relating to Construction & Operation of the Mill's Tailing Cells |
|
| |
(i) Engineers Report: Tailings Management System |
6 MB |
| |
(ii) Engineer's Report: Second Phase Design - Cell 3 Tailings Management Systems |
6 MB |
| |
(iii) Construction Report: Initial Phase - Tailings Management System, February 1982 |
6 MB |
| |
(iv) Construction Report: Second Phase Tailings Management Systems, March 1983 |
19 MB |
| |
(v) Cell 4 Design, White Mesa Project, April 10, 1989 |
27 MB |
| |
(vi) Construction Report: Tailings Cell 4A, White Mesa Uranium Mill - Tailings Management System, August 2000 |
14 MB |
| |
(vii) Cell 4A Lining System Design Report for the White Mesa Mill, January 2006 |
21 MB |
| |
(viii) Cell 4A Construction Quality Assurance Report, July 2008 |
205 MB |
| |
Documents Relating to the Chloroform investigation at the Site |
|
| |
(i) Preliminary Corrective Action Plan, August 20, 2007 |
24 MB |
| |
(ii) Preliminary Contamination Investigation Report, November 20, 2007 |
12 MB |