DRC Home > Uranium Mills > Denison Mines
Uranium Mill and Disposal Facilities:
Denison Mines (USA) Corporation: Cell 4A Re-lining Project
Date |
Title |
Author |
Size |
|---|---|---|---|
| 9/17/2008 | E-mail from Dave Rupp; Approval Letter; Operations and Maintenance Plan approved with 9/12/08 attachments: 9/12/08 O&M Plan attachments (Initial Filling Plan etc); DMT Monitoring Plan; DMT attachments |
DRC | 5.8 mb |
| 9/16/2008 | E-mail from Harold Roberts Operations and Maintenance Plan-submitted without attachments DMT Monitoring Plan-without attachments |
Denison | 163 kb |
| 9/12/2008 | E-mail from Harold Roberts Operations and Maintenance Plan "09/2008 Revision 1.2 "-with attachments; DMT Monitoring Plan version "09/08 Revision: Denison-6" ; DMT Plan attachments; |
Denison | 5.77 mb |
| 9/10/2008 | Request for Information | DRC | 78 kb |
| 9/9/2008 | Approval of DSUA Cell 4A Construction Quality Assurance Report | DRC | 47 kb |
| 9/2/2008 | E-mail from Harold Roberts Attachment |
Denison | 8.6 mb |
| 8/26/2008 | Request for Information | DRC | 27 kb |
| 8/19/2008 | E-mail from Dave Rupp Design Modification Approval |
DRC | 95 kb |
| 8/18/2008 | Request for Information | DRC | 379 kb |
| 8/15/2008 | E-mail from Harold Roberts Spillway Splash Pad Anchor |
Denison | 960 kb |
| 8/11/2008 | E-mail from Harold Roberts Spillway Splash Pad Anchor |
Denison | 557 kb |
| 8/6/2008 | Request for Information | DRC | 74 kb |
| 8/4/2008 | Revised Reclamation Plan Approval and Request for Evidence of Surety; Reclamation Plan 3.0-Part I; Reclamation Plan 3.0-Part 2; Reclamation Cover-Cross Sections A, B-C; Changes From Revision 2.0 to 3.0 | DRC | 9.65 mb |
| 7/31/2008 | E-mail from Harold Roberts Photos Showing the Slimes Drain Sand Bag Placement |
Denison | 2 mb |
| 7/29/2008 | Cell 4A Operation Request for Information | DRC | 2.49 mb |
| 7/22/2008 | Construction Quality Assurance Report Findings and Request for Information; Primary Liner; Secondary Liner | DRC | 1.14 mb |
| 7/16/2008 | Revisions to the Cell 4A BAT Monitoring E-mail from Harold Roberts Attachments 1 and 2 |
Denison | 19 mb |
| 7/2008 | Geosyntec Consultants As-Built Report for Cell 4A; Primary Liner; Secondary Liner |
Denison | 205 mb |
| 6/25-7/2 2008 | June and early July E-mails - Subject "DUSA Cell 4A Construction: Two Items Noted" | Denison/DRC | 247 kb |
| 6/23/2008 | Request for Information | DRC | 23 kb |
| 6/6/2008 | Request for Information | DRC | 33 kb |
| 3/17/2008 3/14/2008 |
Ground Water Discharge Permit Public Participation Summary |
DWQ | 2.6 mb |
| 10/25/2007 | Draft Ground Water Discharge Permit |
DWQ | 943 kb |
| 9/20/2007 |
Response Letter |
Denison | 135 kb |
| 9/28/2007 |
DRC | 91 kb |
|
| 9/27/2007 | Technical Specifications |
Denison | 809 kb |
| 926/2007 9/18/2007 |
DRC | 135 kb |
|
| 8/31/2007 | Hydration of Geosynthetic Clay Liner (GCL) |
Denison | 6.05 mb |
| 6/25/2007 | Design Approval Letter | DRC | 107 kb |
| 6/2007 | Summary of Documents Submitted to DRC | DRC | 71 kb |
| 6/22/2007 | Email from H.R. Roberts |
Denison | 2.20 mb |
| 6/19/2007 | Email from H. R. Roberts |
Denison | 1.88 mb |
| 6/15/2007 | Denison | 101 kb |
|
| 6/5/2007 | Summary of Telephone Meeting | DRC | 49 kb |
| 5/22/2007 | Draft URS Technical Memo Regarding Round 7 Response |
DRC | 306 kb |
| 5/15/2007 | Denison | 3.15 mb |
|
| 5/2/2007 | Round 7 Information Request and Interrogatory (URS) | DRC | 209 kb |
| 3/28/2007 | Denison | 306 kb |
|
| 2/8/2007 | Round 6 Information Request and Interrogatory (URS) | DRC | 664 kb |
| 12/8/2006 | Denison |
1.68 mb |
|
| 11/9/2007 | Round 5 Letter and Technical Review (URS) - Geosynthetic Clay Liner Test Pad |
DRC | 106 kb |
| 10/6/2006 | Round 5 Information Request and Interrogatory (URS) | DRC | 2.03 mb |
| 8/29/2006 | Denison | 1.02 mb |
|
| 7/20/2006 | Round 4 Information Request and Interrogatory (URS) | DRC | 2.03 mb |
| 6/22/2006 | Round 3 Information Request and Interrogatory (URS) | DRC | 597 kb |
| June 2006 | Round 2 Responses to Cell 4A Design Review Part 1: Part 2: |
Denison | 3.31 mb |
| 6/14/2006 6/23/2006 |
DRC | 1.44 mb 1.83 mb |
|
| May-June | Round 1 Responses to Cell 4A Design Review |
Denison | 3.08 mb |
| 5/17/2006 | Round 1 Information Request and Interrogatory (URS) | DRC | 1.44 mb |
| 5/8/2006 | IUC: Completeness Review Response Attachments: |
Denison | 177 kb 2.76 mb |
| 4/28/2006 | DRC | 91 kb 160 kb |
|
| 1/2006 |
Engineering Plates |
Denison | 16.62mb |