If you are seeing this message, you are likely using an older browser to view this site. This website's content is fully accessible to all browsers, however the web site will look much better and your experience will be much more enjoyable if you upgrade your browser to a more current version. Please visit this web site to upgrade your browser.

DEQ.utah.gov -Utah Department of Environmental Quality

Division of Radiation Control

Denison Mines (USA) Corp.

Cell 4A Re-lining Project
Date Title Author Size
7/2008

Geosyntec Consultants As-Built Report for Cell 4A

Denison 205 mb
3/17/2008
3/14/2008
Ground Water Discharge Permit
Public Participation Summary
DWQ 2.6 mb
10/25/2007

Draft Ground Water Discharge Permit
Draft Statement of Basis

DWQ 943 kb
9/20/2007
Response Letter
Denison 135 kb
9/28/2007


Revised GCL Hydration Plan Approval

DRC 91 kb
9/27/2007

Technical Specifications
Revised Construction Quality Assurance Plan
E-mail

Denison 809 kb
926/2007
9/18/2007


E-mail

Request for Additional Information

DRC 135 kb
8/31/2007 Hydration of Geosynthetic Clay Liner (GCL)

Denison 6.05 mb
6/25/2007 Design Approval Letter DRC 107 kb
6/2007 Summary of Documents Submitted to DRC DRC 71 kb
6/22/2007

Email from H.R. Roberts
Revised Drawing Sheets: 1, 2, 3, 4, 5, 6, 7

Denison 2.20 mb
6/19/2007

Email from H. R. Roberts

Denison 1.88 mb
6/15/2007 Denison 101 kb
6/5/2007 Summary of Telephone Meeting DRC 49 kb
5/22/2007 Draft URS Technical Memo Regarding Round 7 Response
DRC 306 kb
5/15/2007 Denison 3.15 mb
5/2/2007 Round 7 Information Request and Interrogatory (URS) DRC 209 kb
3/28/2007 Denison 306 kb
2/8/2007 Round 6 Information Request and Interrogatory (URS) DRC 664 kb
12/8/2006

Denison

1.68 mb

11/9/2007 Round 5 Letter and Technical Review (URS) - Geosynthetic Clay Liner Test Pad
DRC 106 kb
10/6/2006 Round 5 Information Request and Interrogatory (URS) DRC 2.03 mb
8/29/2006 Denison 1.02 mb
7/20/2006 Round 4 Information Request and Interrogatory (URS) DRC 2.03 mb
6/22/2006 Round 3 Information Request and Interrogatory (URS) DRC 597 kb
June 2006

Round 2 Responses to Cell 4A Design Review

Part 1:

Part 2:

Denison 3.31 mb
6/14/2006
6/23/2006
DRC 1.44 mb
1.83 mb
May-June

Round 1 Responses to Cell 4A Design Review

Denison 3.08 mb
5/17/2006 Round 1 Information Request and Interrogatory (URS) DRC 1.44 mb
5/8/2006

IUC: Completeness Review Response

Attachments:

Denison 177 kb
2.76 mb
4/28/2006 DRC 91 kb
160 kb
1/2006

Engineering Plates

Denison 16.62mb

You are here: Home >