DRC Home > Uranium Mills > Denison Mines

Uranium Mill and Disposal Facilities:
Denison Mines (USA) Corporation
: Cell 4A Re-lining Project

 

Date

Title

Author

Size

9/17/2008 E-mail from Dave Rupp; Approval Letter;
Operations and Maintenance Plan approved with 9/12/08 attachments: 9/12/08 O&M Plan attachments (Initial Filling Plan etc); DMT Monitoring Plan; DMT attachments
DRC
5.8 mb
9/16/2008 E-mail from Harold Roberts
Operations and Maintenance Plan-submitted without attachments
DMT Monitoring Plan-without attachments

Denison
163 kb
9/12/2008 E-mail from Harold Roberts
Operations and Maintenance Plan "09/2008 Revision 1.2 "-with attachments; DMT Monitoring Plan version "09/08 Revision: Denison-6" ; DMT Plan attachments;
Denison
5.77 mb
9/10/2008 Request for Information DRC
78 kb
9/9/2008 Approval of DSUA Cell 4A Construction Quality Assurance Report DRC
47 kb
9/2/2008 E-mail from Harold Roberts
Attachment
Denison
8.6 mb
8/26/2008 Request for Information DRC
27 kb
8/19/2008 E-mail from Dave Rupp
Design Modification Approval

DRC
95 kb
8/18/2008 Request for Information DRC
379 kb
8/15/2008 E-mail from Harold Roberts
Spillway Splash Pad Anchor


Denison
960 kb
8/11/2008 E-mail from Harold Roberts
Spillway Splash Pad Anchor
Denison
557 kb
8/6/2008 Request for Information DRC
74 kb
8/4/2008 Revised Reclamation Plan Approval and Request for Evidence of Surety; Reclamation Plan 3.0-Part I; Reclamation Plan 3.0-Part 2; Reclamation Cover-Cross Sections A, B-C; Changes From Revision 2.0 to 3.0 DRC
9.65 mb
7/31/2008 E-mail from Harold Roberts
Photos Showing the Slimes Drain Sand Bag Placement

Denison
2 mb
7/29/2008 Cell 4A Operation Request for Information DRC
2.49 mb
7/22/2008 Construction Quality Assurance Report Findings and Request for Information; Primary Liner; Secondary Liner DRC
1.14 mb
7/16/2008 Revisions to the Cell 4A BAT Monitoring
E-mail from Harold Roberts
Attachments 1 and 2
Denison
19 mb
7/2008

Geosyntec Consultants As-Built Report for Cell 4A; Primary Liner; Secondary Liner

Denison
205 mb
6/25-7/2 2008 June and early July E-mails - Subject "DUSA Cell 4A Construction: Two Items Noted" Denison/DRC
247 kb
6/23/2008 Request for Information DRC
23 kb
6/6/2008 Request for Information DRC
33 kb
3/17/2008
3/14/2008
Ground Water Discharge Permit
Public Participation Summary
DWQ
2.6 mb
10/25/2007

Draft Ground Water Discharge Permit
Draft Statement of Basis

DWQ
943 kb
9/20/2007
Response Letter
Denison
135 kb
9/28/2007

Revised GCL Hydration Plan Approval

DRC
91 kb
9/27/2007

Technical Specifications
Revised Construction Quality Assurance Plan
E-mail

Denison
809 kb
926/2007
9/18/2007

E-mail
Request for Additional Information

DRC
135 kb
8/31/2007 Hydration of Geosynthetic Clay Liner (GCL)

Denison
6.05 mb
6/25/2007 Design Approval Letter DRC
107 kb
6/2007 Summary of Documents Submitted to DRC DRC
71 kb
6/22/2007

Email from H.R. Roberts
Revised Drawing Sheets: 1, 2, 3, 4, 5, 6, 7

Denison
2.20 mb
6/19/2007

Email from H. R. Roberts

Denison
1.88 mb
6/15/2007 Denison
101 kb
6/5/2007 Summary of Telephone Meeting DRC
49 kb
5/22/2007 Draft URS Technical Memo Regarding Round 7 Response
DRC
306 kb
5/15/2007 Denison
3.15 mb
5/2/2007 Round 7 Information Request and Interrogatory (URS) DRC
209 kb
3/28/2007 Denison
306 kb
2/8/2007 Round 6 Information Request and Interrogatory (URS) DRC
664 kb
12/8/2006

Denison

1.68 mb

11/9/2007 Round 5 Letter and Technical Review (URS) - Geosynthetic Clay Liner Test Pad
DRC
106 kb
10/6/2006 Round 5 Information Request and Interrogatory (URS) DRC
2.03 mb
8/29/2006 Denison
1.02 mb
7/20/2006 Round 4 Information Request and Interrogatory (URS) DRC
2.03 mb
6/22/2006 Round 3 Information Request and Interrogatory (URS) DRC
597 kb
June 2006

Round 2 Responses to Cell 4A Design Review

Part 1:

Part 2:

Denison
3.31 mb
6/14/2006
6/23/2006
DRC
1.44 mb
1.83 mb
May-June

Round 1 Responses to Cell 4A Design Review

Denison
3.08 mb
5/17/2006 Round 1 Information Request and Interrogatory (URS) DRC
1.44 mb
5/8/2006

IUC: Completeness Review Response

Attachments:

Denison
177 kb
2.76 mb
4/28/2006 DRC
91 kb
160 kb
1/2006

Engineering Plates

Denison
16.62mb